Home
Technology
Products
News
About
FAQ
Contact
 

Frequently Asked Questions

General Biodiesel Information

How is Biodiesel different than other alternative fuels?
  1. Biodiesel is the only fuel that can be used directly in all diesel engines with out any modification to the engine
  2. Biodiesel is a very specific compound that is produced and tested under strict standards, ensuring a quality, reliable, and trouble free product.
  3. Biodiesel is 100% environmentally friendly, and non toxic.
  4. Biodiesel reduces many emissions, some by 100%.
  5. Biodiesel burns clean in the engines, and is a 100% sustainable product.
What exactly is biodiesel? Biodiesel is made by breaking apart the vegetable oil triglyceride molecule, and recombining the ester chain with methanol, creating clean burning methyl ester molecules.
If I produce biodiesel fuel can I get the $1.00 per gallon tax incentive? Yes. However the fuel must be blended with petroleum diesel in order to qualify. In the B20 mix (20% bio / 80% petro) blenders will get $0.20 per gallon of finished fuel.
Will I be able to make money? Yes. But it takes some careful planning and local market analysis. Generally, there are two markets. Smaller operations located near feed stock sources, and larger operations, generally located near large distribution hubs.
What about regulations, permits, zoning, and other legal issues? The best location for understanding and learning about these and many other facts is at the National Biodiesel Board website:
  www.nbb.org
How much land will I need and what size of building? That depends upon the size of the plant you intend to build, but generally a half acre or so for a smaller unit.
Will I need rail access? If you intend to produce more than 5 million gallons annually it might be a good.
Where can I get feed stock? There are a number of websites
Where can I get processing chemicals? There are numerous chemical supply houses on the internet
What exactly is waterless wash and why is that better than using water to clean the fuel? Waterless wash is a process that Greenline pioneered. Because our systems do not use any water in the process, there is no contaminated waste water.

Waterless polishing of the fuel also has two other positive rewards.
a) the fuel has a longer storage life, and
b) the fuel is not saturated with water (biodiesel will hold more water than regular diesel.

Other systems that use a water wash cleaning process produce saturated fuel that may have a higher cloud point causing filter blockage in cooler climates.

Greenline Biodiesel Processors

What makes the Greenline Biodiesel Processors so special?
  1. We have the only waterless wash, continuous flow system being manufactured today
  2. Our systems have ZERO toxic waste and no contaminated waste water.
  3. Our systems are computer controlled and fully automated.
  4. We guarantee ASTM fuel
FFA and the process Our system is designed to produce ASTM 6751 fuel, using feedstock with less than 5% FFA. Other feedstock will require acid esterification.
How much will a system cost to purchase? Depends upon size and configuration, please contact Greenline Marketing
How much methanol is lost? We lose almost no methanol. 99% of free methanol from the fuel is recovered, all other systems are closed, scavenged and condensed for reuse in the system.
What exactly does Greenline provide? Greenline provides a pipe to pipe solution. All you need are storage tanks, a CDA source, and electrical power.
How storage capacity will I need? Greenline recommends at least one week, this largely depends upon the shipping and receiving intervals within your area.
How will I test the fuel? Most of the testing of raw materials and fuel product can be tested on site with a minimum amount of equipment. For free and total Glyceride count, we recommend using a local lab. (cost effective)
How long will it take to get the plant up and running? That depends upon the size, generally around 6 months.
How long has Greenline been in business? Greenline and its core engineering group have been working in the biodiesel industry for over 8 years. Greenline has over 10 plants in contract or operation across the U.S.
What will I need to provide? You must provide a suitable site, electrical power, CDA, and storage tanks.
Is there a working plant that I can visit? Yes. Qualified candidates who are in the final stages of the purchase cycle are welcome to visit our state of the art plant. It is a 3 million gallon plant, and is online and producing fuel now.
Will Greenline train my workers to use the system? Yes. All Greenline products come with 5 days of training for up to 98 employees.
What kind of warranty is on the equipment? All Greenline equipment is warranted for 1 year parts and labor.
Can I process High FFA feedstock? Yes. Acid esterification must be performed first.
What can I expect after I sign a contract? A typical cycle from sale to fuel production is as follows:
  • Greenline will install the plant at your site
  • Greenline technicians will make all the electrical and plumbing connections
  • We stay onsite until the processor is producing ASTM specification fuel*
  • Greenline will train up to 8 of your operators

* Arrangements can be made to retain Greenline technicians during a transitional period after the plant is producing fuel


 

     Greenline Industries | info@greenlineindustries.com